Turnkey installation with local engineering. Take advantage of your municipality's tax bonuses.
50%
For 3 years
95%
Construction Tax
~1,650
kWh/kWp per year
The Torremolinos City Council offers significant tax incentives to encourage photovoltaic self-consumption. To access the IBI rebate, the application must be submitted along with the initial occupation license and the installation's legalization.
We carry out installations throughout the municipality, highlighting:
For a typical detached house in the El Pinillo or Playamar area:
| Installation | 4 kWp |
| Approx. Cost | ~€5,500 |
| Annual Electricity Savings | ~€900 |
| IBI Savings (Total 3 years) | ~€1,200 |
| Real Payback Period | 3.5 years |
The processing is agile through a responsible declaration. Surplus management depends on the distributor and is usually completed within 1-2 months after the legalization of the installation (Electrical Bulletin).
Yes, we carry out collective self-consumption installations for community of owners in Torremolinos, managing the distribution of coefficients and all necessary permits.
Includes free technical visit and detailed return on investment calculation.
Request Quote Now