Maximizing self-consumption with high aesthetic integration design using Full Black technology.
The client, owner of a single-family home in Marbella with high electrical consumption (36,920 kWh/year) due to air conditioning and solar water heater, sought to drastically reduce grid dependence without compromising the home's aesthetics. A key requirement was to prepare the installation for future physical battery integration.
We designed a 20.0 kWp installation strategically distributed to avoid shadows and respect the architecture:
The installation produces over 30,000 kWh annually, covering the vast majority of daytime demand and compensating for surplus fed into the grid. The environmental impact equals planting 581 trees every year.